Infrastructure

 

INFRASTRUCTURE
 
I
Area of land  allotted (in acres)
 
Whether land transferred in the Name of Samiti
 
Vidyalaya shifted to permanent buildings on
 
 
: 30 Acrs.
 
: Yes
 
 
: Yes
ii
Status of Boundary Wall
 
a.  Brick Wall
b.  Barbed wire fencing
 
 
:  complete
 
BRICK WALL-4 Feet
FENCING-21/2 FEET
iii
Permanent buildings constructed
 
 
: CBRI pattern
 
 
iv
School building
 
 
 
: Complete
v
Dormitories
:  Boys ___06___ Nos.
   with Warden Residence 02 Nos.
 
 
 
:  Girls __02____________ Nos.
   with Warden Residence 02 Nos.
   0.25  New Girls dormitoy
 
vi
Kitchen/dining Hall
 
No. of shifts required for all students  to take food
 
 
:  Complete
 
TWO
vii
Principal Residence
 
 
01 NO.
Mob No. 9880422940
viii
Staff Quarters
 
 
 
 
: Type III = __16_ Nos.
  Type II = __09__ Nos.
  Type  I  =   12 Nos.
HM QUARTERS - 04 NOS.
PRINCIPAL'S RESIDENCE -01 NO.
  SP Sheds converted into Staff Qrs.NIL Nos.
ix
M.P. Hall
 
: Available
x
Workshop
 
: Available
xi
Type of O.H. Tank
 
Its capacity
 
Present Status
 
: Column based
 
:  _1.30.000 litres
 
: Working satisfactory
xii
U.G. tank
 
Its capacity
 
Present Status
 
 
_1,30,000_ litres
 
: Working satisfactory
xiii
D.G. Set
 
 
 
 
:   Available
: __KIRLOSKOR__ make
:   __25____ KVA
: Working
: Year of procurement  - 2010-11
 
xiv
Sewage Pump
 
:  15 H.P., 7.5 HP, 5 HP, 1 HP
xv
Water Pump
 
 
:  5 HP capacity
xvi
Electrification
 
Electric connection
Sub Station building
Street lighting
 
Numbers of hrs. during day when power supply is available on an average.
 
 
 
 :   Urban Feeder
:    Complete
: ____50_____ Nos. of Poles
 
: ___24_____ hrs.
  
xvii
Playfields
 
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 
 
 
:  available
:   02 nos. available
:  02 nos.  available
 
xviii
Water supply
Bore Well
Hand pump
Connection from PHED
 
 
 
: Potable,  _01___ Nos.-  working
: Potable, __05____ Nos.- not working
: 10 hours supply in a day
xix
Rajiv Gandhi Smriti Van
 
:   not available
xx
Fire fighting arrangement
 
:  Working
xxi
Last date of cleaning of
(a)   Septic tank
(b)   Water tanks
 
: MAY 2014
: MARCH 2014
xxii
Whether area around transformer is fenced
:  Yes 
xxiii
Whether open wells, if any, are covered from top
:   N.A
xxiv
Works taken up under M&R fund during current year and last year:-
 
:
Year
Name of work  (M&R)
Expenditure
(Rs. In lacs)
Cumulative expenditure during the year
2014-15
Repair of Drainage Pipe line, replacement  of toilet basins in the dormitories, White wash for toilets & bathrooms in the dormitories, fixing of Electricals & plumbing work Etc.,
4.50 lacs

DONATED BY DEPUTY COMMISSIONER, CHIKKABALLAPURA
 xxv

2014-15


 

1. CC CAMERAS = 16 NOS.   = RS. 2,98,002-00

2. SOLAR LIGHTS = 15 NOS. = RS. 3,44985-00

3. UPS = 5.5 KVA= 04 NOS. 

                 3.5 KVA = 02 NOS.

  BATERRIES 100AH = 40 NOS.                = RS. 6,98,391-00

4. Solar Water Heater 1000 liters= 12 nos. 500 Liters-06 Nos.= RS. Rs. 28,09,254.00

5. Mahendra Bolero ZLX  Vehicle = Rs. 6,95,573-00